Lenel Onguard Electronic Access Control System Installation

Peterson Air Force Base

Project Detail
Category
Construction
Location
Peterson AFB, Colorado
owner
21st Civil Engineering Squadron (CES) Cheyenne Mountain Air Force Station
CONTRACT VALUE
$1,836,359
COMPLETION DATE
June 2021
NAICS
541512

Tribal One was awarded Task Order 2019-0003 under T1 Construction, LLC. This design build project included upgrading all of the locks on four buildings on Peterson AFB from a conventional key only system to a Lennel Onguard Access Control system compatible with the DoD CAC cards.

Major components of the system include:

  • Site survey and technical investigations
  • Design including:
    • Door hardware
    • Communications
    • Electrical
    • Architectural coordination
  • Conduit installation
  • Network and fiber optic cabling
  • Installation of new locks and readers
  • Door and frame modifications
  • Installation of control panels
  • Installation of new electrical requirements
  • Architectural repairs
  • Purchase, installation, and commissioning of a server and client workstations
  • Inside work required security escorts
join our team
Join Our Team

Build a future with Tribal One. Explore the career opportunities available now. 

Let’s Grow Together
Let’s Grow Together

Ready to build a new project, partnership, or opportunity?